Warning: file_put_contents(/opt/frankenphp/design.onmedianet.com/storage/proxy/cache/8002119f753e6561e8632d753dd00f79.html): Failed to open stream: No space left on device in /opt/frankenphp/design.onmedianet.com/app/src/Arsae/CacheManager.php on line 36

Warning: http_response_code(): Cannot set response code - headers already sent (output started at /opt/frankenphp/design.onmedianet.com/app/src/Arsae/CacheManager.php:36) in /opt/frankenphp/design.onmedianet.com/app/src/Models/Response.php on line 17

Warning: Cannot modify header information - headers already sent by (output started at /opt/frankenphp/design.onmedianet.com/app/src/Arsae/CacheManager.php:36) in /opt/frankenphp/design.onmedianet.com/app/src/Models/Response.php on line 20
Grid Trade Master Agreement - Wikipedia Jump to content

Grid Trade Master Agreement

From Wikipedia, the free encyclopedia

The Grid Trade Master Agreement (GTMA) is an agreement for trading electricity within the United Kingdom.[1]

It is normally used either when a power station has excess electricity, which it wishes to "sell back" to the power grid, or when the electricity company wishes to buy surplus power to meet a surge in demand, or reduction in supply.

Although electricity is a non-tangible asset, these agreements are used in order to trade guarantees to provide power for a certain length of time.

Notes

[edit]
  1. ^ "Archived copy" (PDF). Archived from the original (PDF) on 2008-10-06. Retrieved 2008-10-20.{{cite web}}: CS1 maint: archived copy as title (link)