Notice: file_put_contents(): Write of 111232 bytes failed with errno=28 No space left on device in /opt/frankenphp/design.onmedianet.com/app/src/Arsae/CacheManager.php on line 36

Warning: http_response_code(): Cannot set response code - headers already sent (output started at /opt/frankenphp/design.onmedianet.com/app/src/Arsae/CacheManager.php:36) in /opt/frankenphp/design.onmedianet.com/app/src/Models/Response.php on line 17

Warning: Cannot modify header information - headers already sent by (output started at /opt/frankenphp/design.onmedianet.com/app/src/Arsae/CacheManager.php:36) in /opt/frankenphp/design.onmedianet.com/app/src/Models/Response.php on line 20
Steel fixer - Wikipedia Jump to content

Steel fixer

From Wikipedia, the free encyclopedia
A steel fixer with column reinforcement steel
Fixing reinforcement for foundations and walls of sewage pump station in Sacramento, California

A steel fixer (UK, ironworker or "rod buster" in the United States) is a tradesman who positions and secures steel reinforcing bars, also known as rebar, and steel mesh used in reinforced concrete on construction projects.[1]

The work involves following engineering drawings that detail the type of bar and the spacing used and setting out the work. The reinforcing bars are tied together with wire, which is cut using nips, or electric rebar tiers. Steel fixers are also responsible for attaching "spacers" and "chairs" that determine the amount of concrete cover.[2]

See also

[edit]

References

[edit]
  1. ^ Alan Charles Twort, Gordon J. Rees (2003). Civil Engineering Project Management. Elsevier. ISBN 0-7506-5731-6.
  2. ^ Arthur Horace (1988). Reinforced Concrete Design to Bs8110: Simply Explained. Spon Press. ISBN 0-419-14550-8.
[edit]